Kurnool solar park
The Kurnool Solar Park is spread over a total area of 5,932.32 acres (24.0072 km2) in the Gani and Sakunala villages of Kurnool district. The region is arid. The park utilizes over 4 million solar panels with capacities of 315 and 320 Watts. The panels are connected to four 220/33 kV pooling stations of 250 MW each and a 400 / 220kV grid substation through nearly 2,000 circuit kilometres of cables.
Solar park | Kurnool solar park |
---|---|
Name of the SPPD | Andrah Pradesh Solar Power corporation |
Location | kurnool-andra-pradexe-india |
Total capacity installed | 1000 MW |
Date of operation | Mar 29, 2017 |
SPD/IPP(s) | 4 (Greenko, Softbank, Azure, Adani) |
Tariff(s) in INR | 4.63 (850 MW)/5.12(100 MW)/5.13(50 MW) |
Total being generated in MW | -1 |
Total being generated in MWh | 1.830e+6 |
Total being generated in MVAr | 15 |
Total Generated in MW | View graph |
System Voltage Profile | View graph |
System Frequency | View graph |